High Pressure Injection Pump |
|
|
|
Specification
High pressure pouring machine is
the building and build a chemical grout sealing, structural
reinforcement of specialized equipment
Working pressure: instantaneous
maximum pressure up 15000Psi, flow rate of 0.74 liters / minute,
chemical pulp can enter more than 0.02mm depth of 1000mm
hairline cracks
Machinery components must
locking screws, drill must be fully inserted into the holder,
not loose, high-pressure and high-pressure pipe and the main
body perfusion machine gun connections must be wrapped after the
raw material belt tightened to prevent leakage of slurry |
|
Notice
1. Machine during transport will be shaking before use, to
tighten all the screws again
2. Non
impregnated with the slurry particles ingredients
3.Pressure does not prohibit the use of the viscosity of the
liquid, pressure testing machine to test the use of oil and
other
4.The
color of parts varies slightly with different production batches
|
|
Machine cleaning
method
Wash the machine in time after use, so as not to cause machine
blockage.
1. Before the construction, please prepare the thinner of the
cleaning machine. After the construction, the machine should be
cleaned, such as Tianna water, pine perfume, banana water, etc.
2, cleaning method: pour the thinner into about 500 ml into the
barrel of the machine, put the gun head into the barrel, clean
the boot cycle, wash for a while, squirt, pour in new thinner,
In the same way, the machine must be cleaned, and the second
time the diluent can be used as the first cleaning after the
next construction. After the thinner is ejected, pour the oil
into the oil. In the same way, it will be circulated for a while
and sprayed into the oil drum. This will discharge the thinner
and protect the sealing parts inside the machine.
3. During the next construction, pour the slurry into the
bucket, start it first, and drain the oil remaining in the
machine. When the slurry comes out, start grouting. |
Always test the
pressure with the oil before the new machine is used for the
first time.
1. The machine will shake during transportation. Please tighten
all the screws before using the machine.
2. Test the pressure of the machine. It is forbidden to test the
working pressure with liquid without viscosity (such as toluene,
acetone, water, etc.). Use oil such as oil to test the pressure
of the machine. If it is empty, the pressure gauge does not show
pressure.
3. Test method: pour the lubricating oil into the barrel of the
machine, close the valve, the gun head is facing the outside,
open the electric drill, when the pressure gauge shows the
pressure of 300-400 kg, turn off the electric drill, open the
valve, it will lubricate The oil is sprayed back into the oil
drum, and the pressure test is successful. |
|
Item# |
Descrption |
QTY |
Unit |
Note |
230539 |
110V High pressure
injection pump |
1 |
set |
|
|
|
You can make
order with no worries.
Any concerns just feel free to let us know, we'll reply in 24 hours in
normal condition.
Handling Time: Shipping is usually made in 1-3 business days after
payments cleared. Orders are processed from Monday-Friday; Not on the
weekends & public holidays.
Warranty: 6 months' warranty for the machines, not for the consumables.
We stand behind our products all the item, so even if your warranty
period has expired, you can still seek for service or technical support
from us with low cost. |
|